List of philippine government programs
The project will put up a flood protection system in the plains of Baloi, Lanao del Norte to prevent the overflowing of Agus River and save the agricultural areas from inundation.
Construction of an 89 meter center clay core rockfill dam, spillway, 12km transbasin tunnel, power plant with installed capacity of MW, and irrigation and drainage facilities. Establishment of a Capacity restoration of derated 25MW hydroelectric power plant unit to 50MW capacity. The rehabilitation and development of the port is divided into two major components. The rehabilitation and upgrading of the existing facilities, including the extension of the existing pier shall be undertaken by the private sector while the construction of the meter breakwater shall be chargeable to CEZA equity.
The project involves the phased development of Caticlan Airport. It involves the construction of the Access Road and the financing, design, construction, erection, testing, commissioning, operation and maintenance of the Power Station. The Project is a smart card and biometric based identification of alien residents. It involves the automation of the registration and issuance of various documentations to aliens, endorsement and various reports to BI officials and provides an accurate and tamper resistant identification system.
The Operator will finance, design, build, rehabilitate, upgrade, expand, commission, test, operate, maintain and manage the CBK Complex and transfer the same to NPC at the end of the cooperation period. It also involves the construction of two 2 diversion weirs in Casecnan and Taan Rivers in Nueva Vizcaya including The project involves the grant of rights to the Company by the CDC of the following: 1 Financing, design and construction of the new Facilities; 2 Manage, exclusively possess, occupy, operates, repair, maintain, decommission and refurbish the Existing Facilities and manage, own, operate, repair, maintain, decommission and refurbish the new Facilities; 3 Treat Raw Water and waste water in CSEZ; 4 Provide and manage the service; 5 Bill and collect payment from the customers for the services; 6 Extract raw water.
It is intended to meet the evergrowing baseland power demands of the country. The MRT 3 Project encompasses the design, construction, furnishing and equipping, testing and commissioning, and training of operations and maintenance personnel as necessary to operate Phase 1 of the EDSA Light Rail System. The project involves the rehabilitation, expansion, operation, and maintenance of the existing 84 kilometer NLEX that connects Metro Manila and Central Luzon.
An elevated expressway to be constructed along existing major road that will link the South Luzon Expressway and the North Luzon Expressway from Alabang, Muntinlupa to Balintawak, Caloocan City through the mid-western corridor of Metro Manila with a total length of 35 kms. When completed, it will be an alternative to EDSA as a major expressway that will link the northern and southern regions of Luzon.
The project involves site survey and investigation, design and development, equipment supply, construction, completion, testing, commissioning of a MW Coal Fired Thermal Power Plant.
It also includes the construction of access roads, the ash disposal sites, the pipelines and the transmission line. The project involves the grant to the Concessionaire the sole right to manage, operate, repair, decommission and refurbish the Facilities in Service Area, including the right to bill and collect for water and sewerage services supplied in the service area. The project includes a below ground powerhouse with three 3 megawatt turbine-generators and a nearly six-mile-long kilowatt transmission line.
The South Luzon Tollway Extension Project consist of the rehabilitation and expansion of the existing toll road from Alabang to Calamba Tomas, Batangas 5. The project involves the financing, design, construction, operation and maintenance of all the activities of the Southern Tagalog Arterial Road to spur the economic growth and development of the Southern Tagalog Region. The project involves the design, supply, delivery, installation, erection and operation including civil works, testing and commissioning of a MW Coal-Fired Thermal Power Station consisting of 2 x MW generating units.
The project involves establishing and operating a company engaged in the provision of water and sewerage services and in the establishment, operation and maintenance of water and sewerage facilities and systems in the Subic Special Economic and Free Port Zone consisting of the City of Olongapo and the Municipality of Subic, Province of Zambales and the lands by the Subic Naval Base and its contiguous extension.
The project involves the design, financing, construction, operation and maintenance by the private sector of an It has a capacity of 75 MW consisting of three units of 25 MW each and a high rockfill dam that lies along the Agno River.
In , AHEP was damaged by an earthquake and repeated aftershocks. NPC deemed it necessary that the plant undergo rehabilitation and repair to restore its operation. The project involves the development, design, construction, equipping, financing, completion, testing and commissioning, operation and maintenance of a bunker- fired land-based diesel generating power Plant with a Dependable Capacity of 58 MW.
BPPC will operate and maintain the power plant complex for a period of 15 years up to July It also aims to support the optimization of indigenous energy in the country. The MW Binga Hydroelectric Project involves a rehabilitation program for the plant which includes reservoir dredging, construction of check and Sabo dams, undertaking soil conservation and reforestation works, and construction of sluice tunnel as permanent solution to siltation problem.
The project also covers the design, rehabilitation, construction, supply, testing, operation and maintenance of power facilities for a pre-determined period of time.
The Project includes applications development, supply of necessary hardware and software, and connectivity among PhilPost offices.
It will cover the design, development, customization, enhancement, installation, rollout, operation and turnover of postal applications and business systems for PhilPost. The project involves the design, development, construction, equipping, completion, testing, commissioning and operation of a diesel generating bunker-fired Power Station.
The project involves the design, development, financing, construction, completion, testing and commissioning of the Power plant, including the transmission line and switchyard, fuel receiving and storage facilities and other site development works. It also includes the supply, installation and testing of the additional substation equipment needed for the interconnection of the Rosario substation. Automation of the issuance of certified copies, certifications and authentication of civil registry documents; and the issuance of Birth Registry Number BreNs and establishment of a nationwide network to expand provisions of services.
The project involves repair, rehabilitation, operation and maintenance of the complete power generating facilities within the enclosed fenced Power Plant Area designated as Electric Power Generating Plant D, five fuel storage tank and one water storage tank, and all other related structures, tools and supplies located in Clark Air Base with a rated combined capacity of 50 MW.
The project involves the financing, design, construction, erection, testing, commissioning, operation and maintenance of a bunker-C fired diesel generating power station with Black Start Capability and the Transmission Line Facilities. The project involves the design, development, construction, testing, commissioning, operation, maintenance of, and the necessary maintenance for, the 40 MW Power Station with Black Start Capability. The project involves the design, supply, construction, financing, testing and operation of MW power plants which utilize geothermal in the Greater Tongonan area of Leyte, comprising the Upper Mahiao and Malitbog sectors.
The project involves the engineering, supply, installation, and construction, testing and commissioning of full turnkey basis of a MW combined Cycle Power Plant. The project involves the engineering, supply, installation, construction, testing and commissioning on full turnkey basis of a MW Combined Cycle Power Plant. The project involves the operation, maintenance and repair of the Power Station, including the conversion of the heat energy of the Brine into electricity and the delivery of such electricity to NPC.
The project located in Brgy. Malaya, Pililla, Rizal, involves rehabilitation of the existing power generating units in the power complex, extend the effective life of the equipment thereon, and make the power complex more responsive and effective in dealing with day-to-day operation. The project involves the financing, design, supply, construction, testing, commissioning, operation, maintenance and repair of an approximately The project covers the rehabilitation, operation, maintenance and management of the power complex through Rehabilitate-Operate-Maintain ROM.
The project covers the design, development, construction, completion, testing and commissioning of the Power Barge including the switchyard fuel receiving and storage facilities, and all extra works. The project also provides that the Private Proponent shall assess the reliability and conduct necessary repairs in order that the power plant can provide the much needed electricity.
The Cebu grid experienced power shortages and the need to resolve the recurring brownouts in became a primary concern of NPC. Atlas Consolidated Mining and Development Corporation had an existing power generating facility to provide the power requirements of its mining operations.
The project involves the financing, design, construction, erection, testing, commissioning, operation and maintenance of a bunker-C fired diesel generating power station and the Transmission Line Facilities. Establishment of a new public market at a different location in Cauayan City in order to promote economic growth on other parts of the city and decongest the city center of Cauayan City. The project involves the construction, development, operation and management of the proposed mega market.
The development will include a business process outsourcing, commercial areas, hotel, among others. An unsolicited proposal to Cebu City and Municipality of Cordova for the formation of a Joint Venture for the financing, design, construction, implementation, operation and maintenance of an 8.
The project involves the construction of a bulk water supply to augment the supply of water, expand services to other barangays, and to avoid depletion and preserve the aquifer by utilizing as source the ground water. Moreover, the project also aims to improve water quality, provide round the clock water supply, and achieve ideal water pressure. The project involves the installation of a 20MVA substation, the upgrading of primary and secondary equipment distribution transformers and line protection equipment, the replacement of rotten poles, and the purchase of metering, transportation and communication tools and equipment.
The project involves the financing, rehabilitation, ownership, operation, maintenance and management of the Bohol Provincial Waterworks Systems. The project involves the rehabilitation of the existing Butuan City Slaughterhouse and Livestock Auction Market, in order to comply with the standards and procedures of the National Meat Inspection Service NMIS , provide quality meat products and promote the health and safety of the local consumers.
Develop, operate and maintain the new and existing facilities that would increase the capability of the Water District to supply its customers potable treated water from surface raw water of Taguibo River. The project involves the financing, development, rehabilitation, expansion, improvement, Operation and maintenance of the Water Supply System of the Cabanatuan City Water District.
The project involves the construction of a two-storey building which will provide an integrated private wet market and supermarket. The project involves the redevelopment of the existing Parola Terminal into a modern terminal complex with an air-conditioned terminal lobby, ticketing area, canopied loading arcades, public toilets, and designated parking areas and drop-off points.
The terminal is adjacent to a public park and a shopping mall that serves the needs of at least 3, daily passengers between Iloilo City and Guimaras Province. The project covers financing, development, rehabilitation, expansion, improvement, operation and maintenance of the Water Supply and Septage Management System of Jaen Water District.
Php 5, shall be provided to family when two or more family members belong to the vulnerable or disadvantage sectors. LAG will be provided to Sustainable Livelihood Program beneficiary families having at least one 1 member who works in the informal sector and is displaced by reason of the declaration.
Maximum amount of LAG per eligible family shall not exceed Php 15, Assistance shall be in cash or non-cash. DSWD and DOLE shall transfer cash, cash voucher, or goods through the LGUs or directly to families who have no incomes or savings to draw from including families working in the informal economy and those who are not currently recipients of the current 4Ps, of an amount adequate to restore capacity to purchase basic food and other essential items during the duration of the quarantine.
Waive rental and other fees for Micro, Small and Medium Enterprises: Mall operators and commercial landlords were ordered to waive rents and other fees for stores that are forced to shut down during the day community quarantine in Metro Manila. The movement of the cargoes of the following enterprises within, to and from entire Luzon shall be unhampered, or not be delayed upon presentation of the cargo manifest or delivery receipt indicating the destination, nature and quantity of the loaded goods to assigned inspectors: 1 Manufacturing of Food and Essential Products 2 Medicine and Medical Supplies 3 Retail Establishments Groceries, Supermarkets, Hypermarkets, Convenience Stores, Pharmacies And Drug Stores 4 Export And Business Process Outsourcing BPO Companies Movement of personnel needed to operate the covered enterprises: Employee working in the above enterprises and establishments shall be allowed to enter and exit control points upon presentation of any of the following: 1 Valid Company Identification Card 2 Proof Of Residence 3 Certification Of Employment.
The microfinancing program offers loans ranging from P5, — P, with a minimal interest rate of not more than 2. SB Corp.
For more information, you may reach P3 through hotline , their official Facebook page, or their email p3 sbgfc.
Eligible for micro and small enterprises with at least one year continuous operation prior to March and whose businesses suffered drastic reduction in sales during the epedemic. Loan conditions: 1 Updating of loan amortizations for vehicle loans or other fixed asset loans of affected business 2 Inventory replacement for damaged perishable stock 3 Working capital replacement to restart the business.
Documentary requirements — a. Clearance, b. Philippine Standard Time. Sitemap Accessibility Features Skip to Content. You are here: Home Programs and Projects.
Journals and Newsletters. DOST Links. Other Links. Central Office. This certifies it as a stable and referenceable technical standard. There are testable success criteria for each guideline. A guide to understanding and implementing Web Content Accessibility Guidelines 2.
Work is being done to make the system fully compliant with this level. Press esc, or click the close the button to close this dialog box. Philippine Standard Time. You are here: Home Major Programs and Projects. The Anti-Drug Strategy Drug supply reduction efforts involving aggressive law enforcement and prosecution with strong adherence to the rule of law and observance of human rights, coupled with comprehensive demand reduction initiatives and supported by strong international ties.
Components of the Anti-Drug Strategy Drug Supply Reduction Take away drugs from the public through market denial operations and prevention of diversion from the licit to illicit market; and reduce the proliferation of illegal drugs through sustainable alternative development programs.
Regulatory Compliance The Board continually update list of drugs for regulation and monitor drug abuse trends to determine the possible inclusion of new drugs and substances. Drug Demand Reduction Take people away from the lure of drug abuse through policy formulation, preventive education, research, treatment, rehabilitation and reintegration; provision of alternative development programs and forging cooperation with regional and international agencies and counterparts.